NCDMB upgrades capacity of Bayelsa power plant to 20 megawatts

0
426

NCDMB upgrades capacity of Bayelsa power plant to 20 megawatts

The management of the Nigerian Content Development and Monitoring Board (NCDMB) has confirmed the upgrade of its 10 Megawatt installed capacity power plant to 20 Megawatt in Yenagoa, the Bayelsa State capital.

General Manager, Corporate Communication and Zonal Coordination Division at NCDMB, Engr Ginah O. Ginah, explained the reasons behind the upgrade during a tour of the Board’s facilities in South-South Nigeria and Bayelsa State in particular, by members of the Guild of Corporate Online Publishers (GOCOP).

READ ALSO: NCDMB calls for manufacturers as it opens Nigeria’s first oil and gas park

Engr Ginah said the idea was part of the agency’s expansion scheme which will supply power to the almost completed National Oil and Gas Park Scheme at Emeyal 1 in Ogbia Local Government.

He said, “With the currently generated 10 Megawatt, the plant is servicing our head office, the Nigerian Content Tower in Yenagoa and Bayelsa State Government House 24/7.

“But with the ongoing double upgrade, we are ready to power mega estates in Yenagoa, who are willing to take electricity from us. Besides, the upgrade will supply power to the almost completed National Oil and Gas Park Scheme at Emeyal 1 in Ogbia Local Government.

READ ALSO: Working visit to NCDMB Industrial Park at Odukpani, Cross River State, by GOCOP (Pictorial)

Engr. Ginah, who revealed that the Power Plant is operating on gas, averred that the idea to double the capacity was conceived as part of the NCDMB’s general development plan to grow local content in the Nigerian oil and gas industry.

Follow the Neptune Prime channel on WhatsApp: https://whatsapp.com/channel/0029Va74ZvU2v1IqKByXoX3d

Do you have breaking news, interview request, opinion, suggestion, or want your event covered? Email us at neptuneprime2233@gmail.com